The Scope of this projects conternts and not limited to Excavation of topsoil,Filling Type 1 (General Fill) , Filling Type 2 (Structural Fill) material obtained from borrow pits and sorted/mixed to meet specification
requirements, placed in layers not exceeding 200mm in thickness above the rough grade area for flood alleviation purposes and compacted to achieve 95% maximum dry density.
COPYRIGHT BY MADAR ALFAYHAA CO. ALL RIGHTS RESERVED. POWERED BY BEON SOLUTIONS