ME&I at Khor Azubai Gas Unit

Project Info

Construction Date

3/5/2013

Category

Completed Projects

Client Name

KBR

Project Location

BASRA

Current Progress

100%

Project Information

Scope of Work in KAZ area as follow:
• Installation and hook-up of gas treatment facility.
• Erection of ME&I equipment and structures
• Tie-ins in gas treatment facility existing 
• Interconnecting to gas treatment facility 
• Installation of power and control cables.
• Installation of piping system with all insulation works


COPYRIGHT BY MADAR ALFAYHAA CO. ALL RIGHTS RESERVED. POWERED BY BEON SOLUTIONS