The project includes rehabilitation work on rain water networks to prevent flooding during winter" Project details: The main items include sewage drainage works (Foul and rain water), and corresponding auxiliary works. The total length of sewage pipeline network DN200~DN1500 is 145,682m; the total length of rainwater pipeline network DN300~DN1800 is 93,026m
COPYRIGHT BY MADAR ALFAYHAA CO. ALL RIGHTS RESERVED. POWERED BY BEON SOLUTIONS