Al Meshraq Pipe Line Project
In Jun 2009, Madar Alfayhaa has winned by EPC project of Al Meshraq Pipe Line Project form Mott MacDonald for 8 months, this project including Engineering and procurement of 2360 m lenght polyatheen pipes in different sizes, and provide all the required staff and equipments to execute this works.
Including lining the excavation, and concrete works of 300 manholes.
MFCO execute this project in time by Iraqi Local Staff.
COPYRIGHT BY MADAR ALFAYHAA CO. ALL RIGHTS RESERVED. POWERED BY BEON SOLUTIONS